How an electrical compliance company reduced reporting time from weeks to days.

Every report, every schedule, and every invoice is faster than before.

USE CASE: Electrical Compliance, Field Service Operations

READ TIME: 4 minutes

UK-based electrical compliance company.

High volume of Electrical (EICR, PAT) and Fire inspections.

50+ field engineers.

Before Novumlogic: a workflow held together by manual effort

Reaction Group already had experienced engineers and a capable admin team. That was never the problem.

There was no clear way to see where a report was stuck in the process, so a small error on one job could trigger days of back-and-forth before anyone caught it. Admin spent its time verifying and fixing rather than managing operations, and engineers ended up redoing work they had already done once. Reports were taking four to six weeks to finish, and the backlog was growing faster than the team could clear.

The Problem:

  • Reports taking 4- 6 weeks to complete
  • The admin team is overloaded with verification and corrections.
  • Frequent errors leading to rework
  • Limited visibility of report status

From a  job to a finished report

A sale at Reaction Group used to mean waiting on admin to check engineer availability and call the client back, the kind of lag that gives a deal time to go cold. Now the sales team books a live engineer slot from inside the CRM and sends a signing link before the call ends, with customer, site, and pricing data already pulled through and ready.

By the time an engineer reaches the site, the job, the schedule, and the data behind it are already set, with nothing to enter by hand and nothing to double-check against a spreadsheet. Behind that, admin now works from a single calendar that shows every engineer, every job, and every location for the day, with profit and loss visible per job as it happens rather than being guessed at month-end. Hotel logistics for longer jobs sit in the same view, so the next morning’s routing is accurate instead of assumed.

"We're running 40-50% faster now, sometimes 2x. Easily saving an hour-plus a day on this"


On-site and back at the office

Out in the field, engineers capture asset details, log issues, and get signatures straight from the site, even with no signal. The report builds itself from that data instead of waiting for someone back at the office to assemble it from notes. The same engineers who were completing roughly 45 circuits a day are now completing close to 90, doing more of the actual job and less of the paperwork around it.

Back at the office, admin can step into the customer’s own view to resolve a query without ever calling the engineer, and can see exactly how each site and each engineer is performing as the data comes in, rather than after the fact.

After the report goes out

Clients now pull their own certificates and invoices from a self-serve portal instead of calling Reaction Group for them, and can see their compliance position across every site in one place. Certificates are only released once an invoice is paid, which is part of why payment started coming in faster.

On the equipment itself, a branded QR sticker on every circuit board means anyone on site can scan it and see full circuit detail instantly, with no login and no call back to the office required.

This capability has helped them win work against firms charging significantly more. When a prospect's facilities manager can scan a board on-site and see full circuit detail in seconds, the conversation about price changes entirely.

Reaction Group’s workflow, before vs. after

Area Before After Impact
Reporting turnaround 4 to 6 weeks per report About 1 week per report ~53% reduction in delays
Engineer output Roughly 45 circuits per engineer per day Roughly 90 circuits per engineer per day Same headcount, double the output
Admin workload Verifying, fixing, and chasing reports manually Live verification, queries resolved without contacting the engineer Admin freed for operations, not data entry
Sales to job Manual availability checks and callback lag Slot booked and signed live on the call Not a single deal goes cold waiting on admin
Scheduling Spreadsheets and informal hotel arrangements Single calendar with live profit and loss per job Full day-by-day visibility
Client experience Calls and emails for every certificate or invoice Self-serve portal with automated renewal reminders Lower admin call volume, faster invoicing

Business Impact

  • Faster reports = faster payments
  • More jobs completed without increasing headcount.
  • Reduced rework improved overall efficiency.
  • Better visibility and control over reporting timelines.

Why this matters beyond Reaction Group

None of this comes down to how one team works. Any electrical compliance business operating at volume hits the same wall eventually. Verification that only happens after something has already gone wrong. A workflow that grows more expensive to run as the business grows, instead of less.

Hiring more admins doesn't fix that. Neither does pushing the existing team harder. The fix starts with seeing exactly where the workflow is losing time, before deciding what to rebuild.

If your reporting process takes weeks, depends on the admin to catch every error, and involves constant rework, the issue is almost certainly in the workflow.

We offer a paid diagnostic audit - £2,000 £495 for a limited time, three spots available each month. We map your reporting and ops workflow, identify exactly where time and revenue are being lost, and give you a clear fix plan to action immediately.

TL;DR

TL;DR: the bottleneck was never the people

Reaction group relied on manual handoffs that created a backlog downstream. Now the workflow turns every job into a finished report and a paid invoice, and it does so faster and cleaner than before.